Expert articles on TCEQ, RRC, EPA, and OSHA compliance for Texas oil and gas operators.
TCEQ
Every TCEQ compliance deadline Texas operators need to know in 2026, organized by month with actionable guidance.
TCEQ
How TCEQ calculates penalties, typical fine ranges for oil and gas violations, and strategies to minimize your exposure.
Compliance
Complete checklist covering TCEQ, RRC, EPA, and OSHA requirements every small Texas operator needs to stay on top of.
TCEQ
Step-by-step guide for responding to a TCEQ NOV, including timelines, corrective actions, and strategies to minimize penalties.
EPA
Use EPA's ECHO database to research environmental violations, inspection history, and compliance status at any regulated facility.
RRC
Deadlines, forms, filing methods, and consequences of late production reports to the Railroad Commission of Texas.
OSHA
What OSHA inspectors look for at oil and gas facilities, common citations, penalty amounts, and preparation tips.
TCEQ
MSGP requirements, SWPPPs, sampling schedules, inspections, and annual reporting for stormwater compliance.
Safety
RRC Statewide Rule 36, OSHA exposure limits, monitoring equipment, training, and contingency planning for H2S.
RRC
Flaring exceptions, volume reporting, measurement requirements, and penalties under RRC Statewide Rule 32.
TCEQ
PBRs, standard permits, NSR permits, Title V, monitoring requirements, deviation reporting, and common violations.
TCEQ / RRC
TCEQ, RRC, and NRC reporting thresholds, timelines, and procedures for crude oil, produced water, and chemical spills.
TCEQ
Investigation triggers, the inspection process, your rights, document reviews, and what happens after the inspection.
EPA / EPCRA
EPCRA requirements, reporting thresholds, common chemicals that trigger filing, and the March 1 deadline.
TCEQ
Permit types, effluent limits, DMR reporting, sampling requirements, and common TPDES violations.
Operations
Why Excel-based compliance tracking fails at scale and what purpose-built software offers instead.
TCEQ
Agreed orders, default orders, emergency orders, negotiation strategies, and Supplemental Environmental Projects.
Compliance
Biggest compliance risks for small operators, cost-effective strategies, and how to build a program without a dedicated team.
TCEQ
Reportable quantities, 24-hour notification requirements, final reports, and the affirmative defense criteria.
RRC
MIT requirements for injection and disposal wells, testing methods, frequency, and what happens when a well fails.
Want compliance alerts tailored to your operation?
Start Free Trial →